Specify format, wear layer, backing and installation method for each space. Align lot colors, substrate preparation and spare material with the installation contractor.
What you receive
Room-level finish schedule with wear layer, lot and spare quantity.
Project scope
We maintain a comparison of assemblies and exclusions and identify details that require the responsible designer’s approval. Shipping quantities, spare material and site handover are aligned with the actual installation stages.
Translate opening schedules into dimensions, handing, glazing and hardware for each unit. Require identified packing and installation drawings to reduce mix-ups at delivery.
Compare section schedules, coatings and connection details against the project drawings. Check packaging and erection sequence so numbered bundles arrive in the order the site needs.
Define the relocation frequency, lifting points, transport envelope and service connections. Compare models on setup time and repeatable assembly at the user’s intended sites.