Translate opening schedules into dimensions, handing, glazing and hardware for each unit. Require identified packing and installation drawings to reduce mix-ups at delivery.
What you receive
Opening-by-opening window and hardware schedule.
Project scope
We maintain a comparison of assemblies and exclusions and identify details that require the responsible designer’s approval. Shipping quantities, spare material and site handover are aligned with the actual installation stages.
Compare section schedules, coatings and connection details against the project drawings. Check packaging and erection sequence so numbered bundles arrive in the order the site needs.
Define the relocation frequency, lifting points, transport envelope and service connections. Compare models on setup time and repeatable assembly at the user’s intended sites.
Evaluate Chinese and other prefabrication technologies by module dimensions, tolerances and site interfaces. Separate factory scope from foundations, utilities and finishing work in the bid comparison.