Define the relocation frequency, lifting points, transport envelope and service connections. Compare models on setup time and repeatable assembly at the user’s intended sites.
What you receive
Relocation brief with lifting, transport and service interfaces.
Project scope
We maintain a comparison of assemblies and exclusions and identify details that require the responsible designer’s approval. Shipping quantities, spare material and site handover are aligned with the actual installation stages.
Evaluate Chinese and other prefabrication technologies by module dimensions, tolerances and site interfaces. Separate factory scope from foundations, utilities and finishing work in the bid comparison.
Specify the complete partition assembly, including board, framing, fasteners and joints. Compare supplier data for the intended room conditions and flag incompatible combinations before ordering.
Compare declared thermal properties, density, thickness and panel dimensions. Map packaging volumes and protection needs because transport space can outweigh the apparent price advantage.