Construction systems
Coordinate industrialized building components, imported materials and on-site installation interfaces.

Project scope
We maintain a comparison of assemblies and exclusions and identify details that require the responsible designer’s approval. Shipping quantities, spare material and site handover are aligned with the actual installation stages.
Supply drawings, quantities by location, finish references and the installation sequence. Identify the responsible designer and any performance requirements already set in the project documents.
Services
- Light steel framing
Compare section schedules, coatings and connection details against the project drawings. Check packaging and erection sequence so numbered bundles arrive in the order the site needs.
- Portable buildings
Define the relocation frequency, lifting points, transport envelope and service connections. Compare models on setup time and repeatable assembly at the user’s intended sites.
- Prefabricated construction systems
Evaluate Chinese and other prefabrication technologies by module dimensions, tolerances and site interfaces. Separate factory scope from foundations, utilities and finishing work in the bid comparison.
- Drywall and interior partitions
Specify the complete partition assembly, including board, framing, fasteners and joints. Compare supplier data for the intended room conditions and flag incompatible combinations before ordering.
- EPS thermal insulation
Compare declared thermal properties, density, thickness and panel dimensions. Map packaging volumes and protection needs because transport space can outweigh the apparent price advantage.
- Cement board systems
Review board thickness, edge treatment, joints and supporting frame as a package. Include breakage allowance and handling instructions in the shipping and site handover plan.
- Exterior cladding
Request samples and assembly details for substrate, fixing method and weather exposure. Compare color consistency across lots and the supplier’s provision for future replacement panels.
- Wallcoverings and wallpapers
Calculate roll yield using repeat pattern, usable width and wall height. Record approved finish samples and batch numbers to keep adjoining rooms visually consistent.
- PVC roofing systems
Compare profile geometry, overlaps, fastener kits and compatible ridge pieces. Capture transport length limits and accessories in the bill of quantities before comparing supplier totals.
- Vinyl flooring procurement
Specify format, wear layer, backing and installation method for each space. Align lot colors, substrate preparation and spare material with the installation contractor.
- Window and frame sourcing
Translate opening schedules into dimensions, handing, glazing and hardware for each unit. Require identified packing and installation drawings to reduce mix-ups at delivery.