Rank assets by downtime impact and access to spares. Turn recurring failures and maintenance history into inspection intervals, parts lists and work orders for the local team.
What you receive
Critical-asset register and maintenance calendar.
Project scope
We review the proposal with production and maintenance, record assumptions and agree on a representative acceptance run. The handover identifies the design revision, tests performed and decisions that still require the plant’s sign-off.
Measure queue length, changeover losses and first-pass yield at the constraint. Trial one change at a time and compare equivalent production runs before scaling it.
Use AutoCAD or SOLIDWORKS drawings to review fits, fastener access and assembly order. The release package reconciles model revisions, manufacturing drawings and the bill of materials.
State the load case, boundary conditions and material assumptions before interpreting stress plots. A sensitivity review shows which assumptions need physical measurements or a prototype test.