State the load case, boundary conditions and material assumptions before interpreting stress plots. A sensitivity review shows which assumptions need physical measurements or a prototype test.
What you receive
Model assumptions, result plots and physical validation priorities.
Project scope
We review the proposal with production and maintenance, record assumptions and agree on a representative acceptance run. The handover identifies the design revision, tests performed and decisions that still require the plant’s sign-off.
Connect part geometry to the shop’s machine envelope, stock, fixtures and tools. The handoff includes setup references, revision control and the first-piece inspection points.
Observe a complete production cycle and separate waiting, handling and machine time. Use the measured constraint to select automation opportunities and estimate the effect on throughput.
Compare payload, reach, orientation changes, tooling and available floor space. A cycle diagram identifies where manual intervention, guarding review and process trials belong.