Measure queue length, changeover losses and first-pass yield at the constraint. Trial one change at a time and compare equivalent production runs before scaling it.
What you receive
Baseline and trial comparison with throughput and rework measures.
Project scope
We review the proposal with production and maintenance, record assumptions and agree on a representative acceptance run. The handover identifies the design revision, tests performed and decisions that still require the plant’s sign-off.
Use AutoCAD or SOLIDWORKS drawings to review fits, fastener access and assembly order. The release package reconciles model revisions, manufacturing drawings and the bill of materials.
State the load case, boundary conditions and material assumptions before interpreting stress plots. A sensitivity review shows which assumptions need physical measurements or a prototype test.
Connect part geometry to the shop’s machine envelope, stock, fixtures and tools. The handoff includes setup references, revision control and the first-piece inspection points.