Review datum references, tolerances and surface finish against inspection capability. Suppliers quote using the same drawing revision, material condition and lot size.
What you receive
Shop comparison and first-piece measurement requirements.
Project scope
We review the proposal with production and maintenance, record assumptions and agree on a representative acceptance run. The handover identifies the design revision, tests performed and decisions that still require the plant’s sign-off.
Inventory connected loads, duty cycles and installation constraints before requesting equipment proposals. Interface schedules identify the electrical information required from each machine vendor.
Rank assets by downtime impact and access to spares. Turn recurring failures and maintenance history into inspection intervals, parts lists and work orders for the local team.
Measure queue length, changeover losses and first-pass yield at the constraint. Trial one change at a time and compare equivalent production runs before scaling it.