Choose a lot large enough to expose assembly variation. Track yield, rework, operator feedback and inspection time to decide which changes must precede series production.
What you receive
Pilot run report with yield, defects and series-release decisions.
Project scope
We review the proposal with production and maintenance, record assumptions and agree on a representative acceptance run. The handover identifies the design revision, tests performed and decisions that still require the plant’s sign-off.
Review datum references, tolerances and surface finish against inspection capability. Suppliers quote using the same drawing revision, material condition and lot size.
Inventory connected loads, duty cycles and installation constraints before requesting equipment proposals. Interface schedules identify the electrical information required from each machine vendor.
Rank assets by downtime impact and access to spares. Turn recurring failures and maintenance history into inspection intervals, parts lists and work orders for the local team.