Observe a complete production cycle and separate waiting, handling and machine time. Use the measured constraint to select automation opportunities and estimate the effect on throughput.
What you receive
Constraint study and ranked automation opportunities.
Project scope
We review the proposal with production and maintenance, record assumptions and agree on a representative acceptance run. The handover identifies the design revision, tests performed and decisions that still require the plant’s sign-off.
Compare payload, reach, orientation changes, tooling and available floor space. A cycle diagram identifies where manual intervention, guarding review and process trials belong.
Translate operating conditions into interfaces between mechanics, electronics and control software. Prototype reviews focus on measurable behavior at those interfaces before the design is frozen.
Choose a lot large enough to expose assembly variation. Track yield, rework, operator feedback and inspection time to decide which changes must precede series production.