A quoted monthly capacity may include other customers’ orders. We review shifts, bottleneck equipment, subcontracted operations and available inspection records before comparing the achievable volume with your delivery schedule.
What you receive
A capacity table by process, shift and constraint, with proposed verification steps.
Project scope
We agree what evidence would justify a purchase, who will confirm each item and which gaps would stop a candidate advancing. Quotes, samples and factory observations retain their dates and sources so the buyer can revisit the recommendation.
Put every bidder on the same revision of the drawing. We specify quantities, acceptable substitutions, packaging and delivery point, then flag exclusions so a missing operation cannot look like a lower price.
Normalize currency, order size and delivery terms before comparing freight, insurance, broker estimates and inland transport. The worksheet shows which inputs are quotations and how exchange-rate or shipment-size changes affect the ranking.
Agree which characteristics the sample must demonstrate and whether it came from production tooling. We track revisions, photographs and buyer feedback in an approval record that can travel with the first purchase order.